Tankers for oil and technological solutions insulated ACTM are designed for transportation of process water, clay and salt solutions, their supply to mobile pumping units during various washing and selling operations in oil and gas wells.
Attention! While driving the tank should be completely empty or full, since the movement of partially filled tank can lead to overturning.
Tankers for oil and technological solutions insulated specifications
A specialized vehicle includes a tanker installed on KamAZ 65111-3090-50 (EURO 5) chassis with spare wheel Holder.
The tank has a volume of 12 cubic meters. The tank ATSM-12 consists of 2 section, the base and covering the service. Luke closes thermally insulated lid. The tank body is made of sheet carbon steel 09G2S (4 mm). The tank has a filling pipe.On top of the tank welded neck with a manhole (⌀ 500 mm), on top of the tank welded neck with a manhole, bottom welded sump and flange for connection to the pump unit. Also in the tank are installed air ducts-tubes, with the ends displayed in the neck.
Pipelines have effective protection against freezing in winter. The tank has a sealed compartment with pipelines.
Tanker truck is safe to operate, equipped with handrails and convenient service platforms, having a perforated surface against sliding under any climatic conditions.
NPO “Vektor” designs and manufactures tanks to the specific needs of customers: on request we can change the design.
-
Cross-section form Suitcase (rus. ”chemodan”)
-
Tanker and subframe fixation: with metal fixing straps
-
Subframe and chassis framework fixation: with metal ladders with spring tabs. Between subframe and chassis framework there is a rubber damper pad.
-
Insulation of the tank 100 mm.
-
Steel grade: low-allow steel with a minimum thickness of 4 mm.
-
The color of the container is orange with the inscription on the sides and back "Flammable»
-
Breathing valve UD-1 on each neck, bottom valve DKP90 with control from the cabin in the compartment for diesel fuel
-
Ladder for lifting and maintenance of filler necks
-
Removable filler neck service platform with handrail and non-slip perforated sheet in the base, aluminum neck hatches
-
Two pencil cases (round section) - plastic on the sides of the tank with a dropper
-
Two nodes of issuing fuel into each compartment in a separate process Cabinet (one for cab, one in the rear compartment of the tank), node of issuing fuel under diesel fuel equipped with a tap dispensing ACT 25, the counter PPO-25, transfer case sleeve, antistatic-4.5 m, the filter lamp. Node of issuing fuel for oil is equipped with: transfer valve with anti-drip tip, account for viscous liquids Piusi K44 (Italy), transfer sleeve 5 m., lantern lighting.
-
Pump unit SVN-80 (installed on the frame), capacity 35 cubic meters / hour (for diesel fuel) and pump sh-40 (installed in the rear process compartment), capacity 20 cubic meters/hour (for oil), hydraulic pump drive
-
Sleeve pressure-suction – 2 PCs of 4 meters (ДУ75), CAMLOCK quick-release couplings
-
Towbar and pneumatic actuators
The pumping unit provides three modes of operation:
-
filling the tank;
-
discharge of liquid from the tank;
-
pumping liquid, bypassing its own tank.
The production versions of the tank:
-
Tank thermal insulation
-
Anti-corrosion treatment of the tank.
-
The material of the outer cladding of the tank: stainless steel/carbon steel with paintwor
Improvements equipment:
-
Water heating system (water heating equipment, three-circuit ten).
-
Washing equipment (front washing rack, rear washing rack).
-
Fire extinguishing system (diesel pump for pumping water).